Actual problems of interaction of objects of the infrastructure and rolling stock
There are a number of actual problems of modern bridge construction in a context of static-dynamic interaction of bridge designs and the railway rolling stock is considered. The integrated classification of settlement models for research of joint dynamics of system "bridge-train" is offered, the basic criteria and the factors influencing result of numerical modeling and dynamic calculation of bridges are allocated.
- 0
- Kategoria: Pozostałe zagadnienia